Installation Procedure

2019 Chevrolet Trax Premier, AWDSECTION Installation Procedure
  1. GM4111083Courtesy of GENERAL MOTORS COMPANY

    Starter (3) - Install

  2. CAUTION:

    Refer to Fastener Caution

  3. Starter Mounting Bolt (2) Install and tighten 58 N.m (43 lb ft)
  4. Starter Mounting Nut (1) Install and tighten 58 N.m (43 lb ft)
  5. GM4111076Courtesy of GENERAL MOTORS COMPANY

    { If equipped }Engine Coolant Heater Cord (2) - Connect

  6. Battery Positive Cable (4) - Install
  7. Starter Solenoid Cable Nut (3) Install and tighten 12.5 N.m (111 lb in)
  8. Electrical Connector (1) - Connect
  9. Front Wheel Drive Intermediate Shaft Replacement (LE2 with MNH) - Install
  10. Lower the vehicle.
  11. Battery Negative Cable Disconnection and Connection (without KL9)Β Battery Negative Cable Disconnection and Connection (with KL9)Β 
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.