Installation Procedure

2019 Chevrolet Tahoe LS, 4WD, Gas/EthanolSECTION Installation Procedure
WARNING: This page is about a different car, the 2018 Chevrolet Sonic. However, it is still accessible from the selected car via links, so may be relevant.
  1. GM2508849Courtesy of GENERAL MOTORS COMPANY
    CAUTION:

    Refer to Fastener Caution .

    Install the generator (2) with the mounting fasteners (1) and tighten to 35 N.m (26 lb ft).

  2. GM2508846Courtesy of GENERAL MOTORS COMPANY

    Install the battery positive cable (3) and the engine harness connector (1) to the back of the generator. Tighten fastener (2) to 9 N.m (80 lb in).

  3. Install the drive belt tensioner. Refer to Drive Belt Tensioner Replacement .
  4. Install the drive belt. Refer to Drive Belt Replacement .
  5. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and ConnectionΒ .
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.