Installation Procedure

2019 Chevrolet Express 2500 Base, Van Cargo Extended, 6.0L Eng VIN GSECTION Installation Procedure
  1. GM4900291Courtesy of GENERAL MOTORS COMPANY

    Turn Signal Multifunction Switch (1) - Install

  2. GM4900290Courtesy of GENERAL MOTORS COMPANY
    CAUTION:

    Refer to Fastener Caution .

    Turn Signal Multifunction Switch Bolt (2) - Install and tighten [2x] 3 N.m (27 lb in).

  3. Connect all electrical connectors. (1)
  4. Steering Column Trim Cover - Install - Steering Column Trim Cover ReplacementΒ 
  5. Steering Wheel - Install - Steering Wheel ReplacementΒ 
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.