Installation Procedure

2019 Chevrolet Express 2500 Base, Van Cargo Extended, 6.0L Eng VIN GSECTION Installation Procedure
WARNING: This page is about a different car, the 2018 GMC Savana 3500, 2018 GMC Savana 2500, 2018 Chevrolet Express 3500, and 2018 Chevrolet Express 2500. However, it is still accessible from the selected car via links, so may be relevant.
  1. GM4841517

    Blower Motor(1) - Install

  2. GM4841515
    CAUTION:

    Refer to Fastener Caution .

    Blower Motor Bolt(3) - Install and tighten[3x]1.9 N.m (17 lb in)

  3. Blower Motor Cooling Tube (4) - Install
  4. Reposition the wiring harness.
  5. Engine Wiring Harness Bolt(2) - Install and tighten1.9 N.m (17 lb in)
  6. Connect the electrical connector.(1)
  7. GM4840951

    Coolant Recovery Reservoir(1) - Install - Coolant Recovery Reservoir Replacement (LV1)Coolant Recovery Reservoir Replacement (L96, LC8)

RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.