Installation Procedure

2019 Chevrolet Express 2500 Base, Van Cargo Extended, 6.0L Eng VIN GSECTION Installation Procedure
  1. GM4847082Courtesy of GENERAL MOTORS COMPANY

    Body Mount Upper Cushion (4) - Install

  2. Raise the frame (5).
  3. Body Mount Lower Cushion (3) - Install
  4. Body Mount Retainer (2) - Install
  5. CAUTION:

    Refer to Fastener Caution .

  6. Body Mount Bolt (1) - Install and tighten140 N.m (103 lb ft)
  7. GM4847080Courtesy of GENERAL MOTORS COMPANY
    NOTE:

    Do not remove the bolts.

    Body Mount Bolt (1) - Tighten140 N.m (103 lb ft)[14x]

  8. GM4845674Courtesy of GENERAL MOTORS COMPANY

    Lower Intermediate Steering Shaft (1)@Steering Gear - Install - Lower Intermediate Steering Shaft Replacement

  9. Remove the safety stands.
  10. Lower the vehicle.
  11. Install the screws retaining the fuel tank filler pipe to the body.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.