Installation Procedure

2014 Chevrolet Express 2500 Base, Van Cargo, 6.6L Eng VIN LSECTION Installation Procedure
    Fig 1: Turbocharger Vane Control Solenoid Valve With Bracket
    GM1731773Courtesy of GENERAL MOTORS COMPANY
  1. Install the turbocharger vane control solenoid valve to the turbocharger.
  2. CAUTION:

    Refer to Fastener Caution .

  3. Install the vane control solenoid valve bracket and bolt and tighten to 23 N.m (17 lb ft).
  4. Fig 2: View Of Turbocharger Vane Control Solenoid Valve & Electrical Connector
    GM1335540Courtesy of GENERAL MOTORS COMPANY
  5. Connect the turbocharger vane control solenoid valve electrical connector.
  6. Fig 3: View Of Turbocharger Oil Feed Pipe Banjo Bolt
    GM1335577Courtesy of GENERAL MOTORS COMPANY
  7. Position the oil feed pipe to the turbocharger.
  8. Install a NEW turbocharger oil feed pipe washer and the banjo bolt and tighten to 34 N.m (25 lb ft).
  9. Install the EGR cooler tube. Refer to Exhaust Gas Recirculation Valve Cooler Replacement .
  10. Perform the turbocharger learn procedure. Refer to Turbocharger LearnΒ .
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.