Removal Procedure

2014 Chevrolet Express 2500 Base, Van Cargo, 6.6L Eng VIN LSECTION Removal Procedure
  1. Fig 1: View Of Engine Wiring Harness Electrical Connector
    GM1862030Courtesy of GENERAL MOTORS COMPANY

    Disconnect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .
  2. Remove the charge air cooler outlet pipe. Refer to Charge Air Cooler Outlet Pipe ReplacementΒ .
  3. Disconnect the engine wiring harness electrical connector (1) from the intake air heater (IAH).
  4. Disconnect the engine wiring harness electrical connector (2) from the intake air valve.
  5. Remove the nut and the positive battery cable from the IAH.
  6. Fig 2: Identifying Intake Air Valve Bolts
    GM1862033Courtesy of GENERAL MOTORS COMPANY
  7. Remove the throttle body assembly. Refer to Throttle Body Assembly ReplacementΒ .
  8. Fig 3: View Of IAH Gasket
    GM1862035Courtesy of GENERAL MOTORS COMPANY
  9. Remove the IAH and remove and discard the IAH gasket.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.