Installation Procedure

2014 Chevrolet Express 2500 Base, Van Cargo, 6.6L Eng VIN LSECTION Installation Procedure
    Fig 1: Reservoir Cover Smaller O-Ring Seal
    GM2767967Courtesy of GENERAL MOTORS COMPANY
  1. Carefully install the new supply pump to reservoir cover o-ring seals. Position the smaller o-ring seal (1) over the port on the underside of the supply pump and position the larger o-ring seal (2) into the port on the reservoir cover.
  2. Fig 2: DEF Supply Pump Module
    GM2767924Courtesy of GENERAL MOTORS COMPANY
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.