2013 Chevrolet VoltFACTORY OEM SERVICE PROCEDURE

Circuit/System Testing

P0D43 or P0D44

  1. Vehicle OFF and all vehicle systems OFF. It may take up to 2 minutes for all vehicle systems to power down. Disconnect the X1 harness connector at the T18 Battery Charger.
  2. Vehicle ON.
  3. Test for greater than 12 V DC between the ignition circuit terminal A and ground.
    • If less than 12 V 
    1. Vehicle OFF and all vehicle systems OFF. It may take up to 2 minutes for all vehicle systems to power down. Disconnect the X2 harness connector at the T18 Battery Charger.
    2. Test for infinite resistance between the B+ circuit terminal 2 and ground.
      • If less than infinite resistance, repair the short to ground on the circuit.
      • If infinite resistance, replace the T18 Battery Charger.
    • If 12 V or greater 
  4. Replace the T18 Battery Charger.

P0D45 

Replace the T18 Battery Charger.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.