Installation Procedure

2010 Chevrolet Malibu LT, 3.6 7SECTION Installation Procedure
    Fig 1: Identifying ECM Wiring Harness Connectors
    GM1838648Courtesy of GENERAL MOTORS CORP.
  1. Connect the engine wiring harness electrical connectors (1) to the ECM.
  2. Connect the body wiring harness electrical connector (2) to the ECM.
  3. Fig 2: View Of ECM At Battery Tray
    GM1838645Courtesy of GENERAL MOTORS CORP.
  4. Position the ECM above the retainer in the battery tray and slide the ECM down into the retainer.
  5. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (LE5, LE9, LZ4, LZE, or LY7) .
  6. Reset the clock and preset radio stations.
  7. If a NEW ECM was installed, the ECM must be programmed. Refer to Control Module References .
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.