Installation Procedure

2009 Chevrolet HHR LT, 2.4 V, StandardSECTION Installation Procedure
  1. Perform the following procedure before installing the lower and upper intermediate steering shaft bolts:
    1. Remove all traces of the original adhesive patch.
    2. Clean the threads of the bolt with denatured alcohol, or equivalent, and allow to dry.
    3. Apply the appropriate General Motors threadlocker or blue, medium LOCTITEβ„’ 242 to the upper and lower intermediate steering shaft bolts. Refer to Adhesives, Fluids, Lubricants, and SealersΒ  for the appropriate threadlocker.
  2. NOTE: Failure to transfer the scribed marks may result in an off-center steering wheel.
  3. If installing a new intermediate steering shaft then transfer the scribed marks made previously.
  4. Position the intermediate steering shaft and seal assembly to the vehicle.
  5. NOTE: Inspect the intermediate steering shaft seal from the engine compartment to make sure it is seated properly.
  6. Seat the intermediate steering shaft seal to the body pass-through.
  7. Align the scribed marks on the intermediate steering shaft to the scribed marks on the steering column shaft.
  8. Fig 1: View Of Upper Intermediate Shaft Pinch Bolt & Column
    GM854769Courtesy of GENERAL MOTORS CORP.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.