Installation Procedure

2008 Chevrolet Chevy Express G3500, Van Passenger ExtendedSECTION Installation Procedure
WARNING: This page is about a different variant/trim than selected.
    Fig 1: Turbocharger Vane Control Solenoid Valve With Bracket
    GM1731773Courtesy of GENERAL MOTORS CORP.
  1. Install the turbocharger vane control solenoid valve to the turbocharger.
  2. NOTE: Refer to Fastener Notice .
  3. Install the vane control solenoid valve bracket and bolt.

    Tighten:Β  Tighten the bolt to 23 N.m (17 lb ft).

  4. Fig 2: View Of Turbocharger Vane Control Solenoid Valve & Electrical Connector
    GM1335540Courtesy of GENERAL MOTORS CORP.
  5. Connect the turbocharger vane control solenoid valve electrical connector.
  6. Fig 3: View Of Turbocharger Oil Feed Pipe Banjo Bolt
    GM1335577Courtesy of GENERAL MOTORS CORP.
  7. Position the oil feed pipe to the turbocharger.
  8. Install a NEW turbocharger oil feed pipe washer and the banjo bolt.

    Tighten:Β  Tighten the bolt to 34 N.m (25 lb ft).

  9. Install the EGR cooler tube. Refer to Exhaust Gas Recirculation Valve Cooler ReplacementΒ .
  10. Perform the turbocharger learn procedure. Refer to Turbocharger LearnΒ .
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.