Safety Warning
DIY auto repair can cause serious injury, fire, or vehicle damage. These guides are for informational purposes only. Always follow OEM torque specs, wear PPE, and consult a certified mechanic if you are unsure. You are solely responsible for your safety.
SYS.OK|MANUAL.DBβ LIVE
HOMESERVICE MANUALSCHEVROLET2008CHEVY EXPRESS G3500, VAN PASSENGER EXTENDEDREPAIR AND DIAGNOSISEXTERNAL PAGESDIFFERENT CARSECTION 319 (HYBRID ENGINE ELECTRICAL SYSTEM)REPAIR INSTRUCTIONSBATTERY POSITIVE CABLE REPLACEMENT (CONTROL MODULE TO AUXILIARY BEC)INSTALLATION PROCEDURE
2008 Chevrolet Chevy Express G3500, Van Passenger Extended
Installation Procedure
2008 Chevrolet Chevy Express G3500, Van Passenger ExtendedSECTION Installation Procedure
WARNING: This page is about a different car, the 2008 GMC Yukon and 2008 Chevrolet Tahoe. However, it is still accessible from the selected car via links, so may be relevant.
- Install the positive battery cable (1) to the vehicle.
- Connect the positive battery cable electrical connector (1) to the drive motor generator control module.
- Install the positive battery cable clip (5) to the fender inner panel.
- Install the positive battery cable clip (4) to the air cleaner support bracket.
- Install the air cleaner assembly. Refer to Air Cleaner Assembly Replacement .
- Raise and suitably support the vehicle enough to work through the wheel opening.
- Working through the wheel opening, install the positive battery cable clip (3) to air cleaner adapter bracket
- Working through the wheel opening, install the positive battery cable clip (2) to the brake pipe.
- Install the right wheelhouse panel. Refer to Wheelhouse Panel Replacement - Right Side (HP2) .
- Fully raise the vehicle.
- Install the positive battery cable clips (2, 3, and 4) to the frame crossmember.
- Install the engine shield. Refer to Engine Shield Replacement .
- Lower the vehicle.
- Install the positive battery cable lead (5) to the mega fuse stud.
- Install the positive battery cable nut (1) to the mega fuse stud.
Tighten:Β Tighten the nut to 9 N.m (80 lb in).
- Install the auxiliary BEC cover (1).
- Enable the high voltage system. Refer to High Voltage Enabling .
NOTE:
Refer to Fastener Notice
.
RENDER: 1.0x
NO RELATED
Recommended Tools & Savings
Use the Manual With the Right Hardware
Pair factory procedures with proven DIY tools so the instructions are easier to execute.
Affiliate disclosure: We may earn a commission at no extra cost to you.
When to See a Mechanic
Stop DIY work and contact a certified mechanic immediately if any of the following apply:
- β’ You smell fuel, burning insulation, or see smoke.
- β’ Brakes feel soft, pull hard to one side, or make grinding noises.
- β’ The engine overheats, stalls repeatedly, or misfires under load.
- β’ You are missing required tools, torque specs, or safe lifting equipment.
- β’ You are not confident in the next step or safety outcome.