Circuit/System Testing

2008 Chevrolet Chevy Express G3500, Van Passenger ExtendedSECTION Circuit/System Testing
  1. Ignition OFF, disconnect the IPC.
  2. Ignition ON, verify that a test lamp illuminates between the RUN/CRANK relay voltage circuit terminal 5 and a ground.
    • If the test lamp does not illuminate, repair the RUN/CRANK voltage circuit for a short to ground or an open/high resistance.
  3. Verify that a test lamp illuminates between the RUN/CRANK relay voltage circuit terminal 5 and the IPC ground circuit terminal 13.
    • If the test lamp does not illuminate, repair the IPC ground circuit for an open/high resistance.
  4. If all circuits test normal, replace the IPC.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.