Removal Procedure

2008 Chevrolet Chevy Express G2500, Van Cargo, 6.6 6SECTION Removal Procedure
WARNING: This page is about a different car, the 2004 Chevrolet Corvette. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: Locating Reverse Boost Valve
    GM687542Courtesy of GENERAL MOTORS CORP.
  1. Raise and support the vehicle. Refer to Lifting and Jacking the Vehicle in General Information.
  2. Remove the transmission oil pan and filter. Refer to Automatic Transmission Fluid/Filter ReplacementΒ .
  3. Compress the reverse boost valve sleeve into the bore of the oil pump to release tension on the reverse boost valve retaining ring.
  4. Remove the reverse boost valve retaining ring, then slowly release tension on the reverse boost valve sleeve.
  5. Fig 2: View Of Reverse Boost Valve, Pressure Regulator Valve & Components
    GM298157Courtesy of GENERAL MOTORS CORP.
  6. Remove the reverse boost valve sleeve (5) and the reverse boost valve (4).
  7. Remove the pressure regulator isolator spring (3) and the pressure regulator valve spring (2).
  8. Remove the pressure regulator valve (1).
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.