Circuit/System Testing (Battery, Charging System And Starting System)

2008 Chevrolet Chevy Express G2500, Van Cargo, 6.6 6SECTION Circuit/System Testing (Battery, Charging System And Starting System)
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2009 GMC Savana Special, 2009 GMC Savana Camper Special, 2009 GMC Savana, 2009 Chevrolet RV Cutaway, and 2009 Chevrolet Cutaway. However, it is still accessible from the selected car via links, so may be relevant.
  1. Ignition ON, verify that no generator or battery current sensor DTCs are set that would cause a charging system concern.
  2. Ignition OFF, measure the voltage across the battery terminals. The voltage should read 12.0 volts or greater at room temperature.
  3. Connect a carbon pile tester to the battery.
  4. Start the engine and increase the engine speed to 2,500 RPM. Observe the voltage reading on the tester. The voltage should read between 12.6 - 15.0 volts.
    • If not within specified range, replace the generator.
  5. Adjust the carbon pile tester to the specified load test output value, refer to Generator UsageΒ .
    • If not within specified value, replace the generator.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.