Circuit/System Testing

2008 Chevrolet Chevy Express G2500, Van Cargo, 6.6 6SECTION Circuit/System Testing
WARNING: This page is about a different car, the 2009 GMC Sierra, 2009 GMC Cab & Chassis Sierra, 2009 Chevrolet Silverado, and 2009 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
  1. Ignition OFF, disconnect the harness connector at the bed sensor.
  2. Test for less than 10 ohms between the ground circuit terminal B and ground.
    • If greater than the specified range, test the ground circuit for an open/high resistance.
  3. Test for B+ between the signal circuit terminal A and ground.
    • If not the specified value, test the signal circuit for a short to ground or an open/high resistance. If the circuit tests normal, replace the BCM.
  4. If all circuits test normal, test or replace the bed sensor.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.