Component Testing

2008 Chevrolet Chevy Express G2500, Van Cargo, 6.6 6SECTION Component Testing
WARNING: This page is about a different car, the 2008 Cadillac CTS. However, it is still accessible from the selected car via links, so may be relevant.
CAUTION: Refer to SIR Caution .
  1. Ignition OFF, disconnect the harness connector at the right steering wheel control switch.
  2. Test the for less than 2,800 ohms between the ignition circuit terminal 1 and the signal circuit terminal 5.
    • If not the specified range, replace the steering wheel control switch.
  3. Test for infinite resistance between the ignition circuit terminal 1 and the signal terminal 2 with the switch in the open position.
    • If not the specified range, replace the steering wheel control switch.
  4. Test the for less than 2,800 ohms between the ignition circuit terminal 1 and the signal terminal 2 with the switch in the closed position.
    • If greater than the specified range, replace the steering wheel control switch.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.