Installation Procedure

2006 Chevrolet SSR AutomaticSECTION Installation Procedure
    Fig 1: View of Positive Batter Cable
    GM1232268Courtesy of GENERAL MOTORS CORP.
  1. Install the positive battery cable to vehicle.
  2. Lower the vehicle.
  3. Install the positive battery cable to wire looms under hood.
  4. NOTE: Refer to Fastener Notice in Cautions and Notices.
  5. Install the positive cable and nut in the junction box.

    Tighten:Β  Tighten nut to 6 N.m (53 lb in).

  6. Close the hood.
  7. Raise the vehicle.
  8. Install the positive battery cable to the wire looms on top of the right side frame rail.
  9. Connect the negative and positive battery cables. Refer to Battery Negative Cable Disconnect/Connect ProcedureΒ .
  10. Fig 2: Identifying Rear Battery Cover & Bolts
    GM1231396Courtesy of GENERAL MOTORS CORP.
  11. Install the rear battery cover (2) and nuts (1).

    Tighten:Β  Tighten nuts to 10 N.m (89 lb in).

  12. Lower the vehicle.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.