Front Installation Procedure

2006 Chevrolet SSR AutomaticSECTION Front Installation Procedure
    Fig 1: View of Stowage Compartment Extension Panel Weatherstrip
    GM1296400Courtesy of GENERAL MOTORS CORP.
  1. Align the weatherstrip to the stowage compartment extension panel.
  2. Install the weatherstrip attaching retainers.
  3. Push firmly on the weatherstrip retainers to fully seat the attaching retainers.
  4. Cycle the folding top closed.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.