Circuit/System Testing

2006 Chevrolet Chevy Express G2500, Van Cargo, 6.6 2SECTION Circuit/System Testing
WARNING: This page does not describe the selected car, but rather 8 other vehicles, including the 2011 GMC Yukon XL, 2011 GMC Yukon, 2011 Chevrolet Tahoe, 2011 Chevrolet Suburban, and 2011 Chevrolet Avalanche. However, it is still accessible from the selected car via links, so may be relevant.
  1. Ignition OFF, disconnect the X2 harness connector at the left IP junction block.
  2. Ignition ON, transmission in reverse, verify that a test lamp illuminates between the control circuit terminal E3 and ground.
    • If the test lamp does not illuminate, test the control circuit for a short to ground or an open/high resistance. If the circuit tests normal, replace the BCM.
  3. If all circuits test normal, test or replace the left IP junction block.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.