Circuit/System Verification

2006 Chevrolet Chevy Express G2500, Van Cargo, 6.6 2SECTION Circuit/System Verification
WARNING: This page is about a different car, the 2009 GMC Sierra, 2009 Chevrolet Silverado, and 2009 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
  1. Ignition ON, observe the scan tool ECM PNP Switch parameter while shifting the transmission through each range. The reading should change between In Gear and Park/Neutral. (automatic only)
    • If not the specified values, refer to PNP Switch Malfunction.
  2. Ignition ON, command the Starter Relay ON and OFF with a scan tool, or turn the ignition switch to the START position. The starter solenoid should engage and the engine should crank.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.