Installation Procedure

2006 Chevrolet Chevy Express G2500, Van Cargo, 6.6 2SECTION Installation Procedure
WARNING: This page is about a different car, the 2008 Cadillac CTS. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: View Of Battery Retainer Bolt
    GM1296795Courtesy of GENERAL MOTORS CORP.
  1. Install the battery into the vehicle.
  2. NOTE: Refer to Fastener Notice .
  3. Install the battery retainer and bolt.

    Tighten:Β  Tighten the bolt to 18 N.m (13 lb ft).

  4. Fig 2: View Of Battery Heat Shield
    GM1296794Courtesy of GENERAL MOTORS CORP.
  5. Install the battery heat shield. Refer to Battery Heat Shield ReplacementΒ .
  6. Fig 3: View Of Battery Cables
    GM1201077Courtesy of GENERAL MOTORS CORP.
  7. Connect the battery positive cable (1) to the battery.

    Tighten:Β  Tighten the bolt to 17 N.m (13 lb ft).

  8. Connect the battery negative cable (2). Refer to Battery Negative Cable Disconnection and Connection (Side Post)Β .
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.