Installation Procedure

2003 Chevrolet Venture Base, Van Cargo ExtendedSECTION Installation Procedure
  1. Perform the following steps in order to install the knee bolster to the instrument panel:
    1. Align the clips with the slots in the instrument panel.
    2. Push in, in order to secure the knee bolster.
    NOTE: Refer to FASTENER NOTICE in Cautions and Notices.
  2. Install the bolts/screws to the bottom of the knee bolster.

    Tighten 

    Tighten the bolts/screws to 2.5 N.m (22 lb in).

  3. Install the IP insulator. Refer to one of the following procedures:
    Fig 1: Installing Knee Bolster
    G01534507Courtesy of GENERAL MOTORS CORP.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.