Installation Procedure

2003 Chevrolet Venture Base, Van Cargo ExtendedSECTION Installation Procedure
  1. Install the muffler and exhaust pipes over the rear axle and towards the rear of the vehicle.
  2. Install the exhaust hanger insulators to the exhaust pipes.
  3. Install rear crossover.
    Fig 1: Installing Muffler And Exhaust Pipes Over Rear Axle And Towards Rear Of Vehicle
    G01485993Courtesy of GENERAL MOTORS CORP.
  4. Install a new catalytic converter gasket.
    NOTE: Refer to FASTENER NOTICE in Cautions and Notices
  5. Install the catalytic converter bolts.

    Tighten 

    Tighten the catalytic converter bolts to 34 N.m (25 lb ft).

  6. Lower the vehicle.
    Fig 2: Installing Catalytic Converter Gasket
    G01485994Courtesy of GENERAL MOTORS CORP.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.