Installation Procedure

2003 Chevrolet TrailBlazer 4.2 S, 4WDSECTION Installation Procedure
WARNING: This page does not describe the selected car, but rather 7 other vehicles, including the 2002 GMC Yukon XL, 2002 GMC Yukon, 2002 Chevrolet Tahoe, 2002 Chevrolet Suburban, and 2002 Chevrolet Avalanche. However, it is still accessible from the selected car via links, so may be relevant.
  1. Slide the BCM onto the bracket.
    Fig 1: BCM Harness Connectors
    GM387553Courtesy of GENERAL MOTORS CORP.
  2. Connect all the connectors (1) except the brown connector.
  3. Connect the brown connector.
  4. Fig 2: View Of Knee Bolster
    GM348714Courtesy of GENERAL MOTORS CORP.
  5. Install the knee bolster. Refer to KNEE BOLSTER REPLACEMENT (NON-LUXURY) or KNEE BOLSTER REPLACEMENT (LUXURY) .
  6. Connect the negative battery cable(s).
  7. Reprogram the BCM. Refer to Body Control Module (BCM) Programming/RPO ConfigurationΒ .
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.