Installation Procedure

2003 Chevrolet TrailBlazer 4.2 S, 4WDSECTION Installation Procedure
WARNING: This page is about a different car, the 2009 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the drive motor/generator power inverter module cable 3 phase assembly "B".
  2. Install the 3 phase cable to stator bolts.
  3. Install the cable to case retaining bolts.
  4. Install the case cover. Refer to Case Cover Assembly Installation .
  5. Install the drive motor/generator power inverter module cable 3 phase assembly "A".
  6. Install the 3 phase cable to stator bolts.
  7. Install the cable to case retaining bolts.
  8. Install the torque dampener and differential housing assembly. refer to Torque Dampener and Differential Housing with Fluid Pump Installation .
  9. Install the torque dampener. Refer to Torque Dampener Installation .
  10. Install the transaxle in the vehicle. Refer to Transmission Replacement .
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.