Installation Procedure

2003 Chevrolet TrailBlazer 4.2 S, 4WDSECTION Installation Procedure
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2003 GMC Yukon XL, 2003 GMC Yukon, 2003 Chevrolet Avalanche, 2003 Cadillac Escalade EXT, and 2003 Cadillac Escalade ESV. However, it is still accessible from the selected car via links, so may be relevant.
  1. Position the hitch platform to the vehicle.
    NOTE: Refer to FASTENER NOTICE in GM VEHICLES CAUTIONS & NOTICES .
  2. Install the platform hitch bolts to the frame rails and the rear bumper.

    TightenΒ 

    Tighten the bolts to 125 N.m (92 lb ft).

    Fig 1: Installing Platform Hitch Bolts To Frame Rails And Rear Bumper
    G03384581Courtesy of GENERAL MOTORS CORP.
  3. Connect the trailer wiring harness.
    Fig 2: Connecting Trailer Wiring Harness
    G03384582Courtesy of GENERAL MOTORS CORP.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.