Installation Procedure

2003 Chevrolet TrailBlazer 4.2 S, 4WDSECTION Installation Procedure
WARNING: This page is about a different car, the 2003 Pontiac Vibe. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the turn signal/headlamp switch (1) to the steering column. Secure the switch until the tab locks (2).
  2. Connect the turn signal/headlamp switch electrical connector.
    Fig 1: Locating Turn Signal/Headlamp Switch Tab
    G01433437Courtesy of GENERAL MOTORS CORP.
  3. Install the steering column upper trim cover (7) to the vehicle.
  4. Install the steering column lower trim cover (6) to the vehicle. Secure the trim cover with the 3 screws.
    Fig 2: Identifying Steering Column Upper & Lower Trim
    G01433438Courtesy of GENERAL MOTORS CORP.
  5. Enable the SIR System. Refer to DISABLING & ACTIVATING AIR BAG SYSTEM in SIR.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.