Installation Procedure

2002 Chevrolet Venture LT, AWDSECTION Installation Procedure
  1. Connect the electrical connectors to the body control module.
    Fig 1: Connecting Body Control Module Electrical Connectors
    G01813303Courtesy of GENERAL MOTORS CORP.
  2. Align the tabs on the body control module with the slots in the mounting bracket. Push the body control module up until it clicks in place.
  3. Install the right side instrument panel insulator. Refer to CLOSEOUT/INSULATOR PANEL REPLACEMENT - RIGHT .
  4. Connect the battery negative cable. Refer to BATTERY NEGATIVE CABLE DISCONNECT/CONNECT PRO .
  5. Setup the BCM's customized options.
    Fig 2: Installing Body Control Module
    G01813304Courtesy of GENERAL MOTORS CORP.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.