Cylinder Head Gasket: Remove & Replace

2002 Chevrolet RV Cutaway 5.7 RSECTION Remove & Replace
Includes: Remove carbon and check surfaces for warpage. Includes adjust Valves (where applicable) and clean and adjust Spark Plugs.

Applies ToNoteStandard HoursWarranty HoursSkill Level
V8,Gas,5.7L Eng, Both11.07.2B
V8,Gas,5.7L Eng, Left6.74.8B
V8,Gas,5.7L Eng, Right Side7.75.6B
Additional Procedure: CYLINDER HEAD GASKET: Remove & Replace:
V8,5.7L Eng,Gas, Where Air Cond interferes add1.0B
V8,5.7L Eng,Gas, Where Pwr Strg interferes add,Left Side or Both0.30.3B
Where Cruise Control interferes add0.2B
Where Elect Eng System interferes add0.5B
Combination Procedure: CYLINDER HEAD: Disassemble & Assemble:
D&A for Sublet machine operations. Use Necessary Clock Time.B
Combination Procedure: VALVE: Grind:
One0.5A
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.