Installation Procedure

2002 Chevrolet Cavalier Base, 4D Sedan, 2.4 TSECTION Installation Procedure
  1. Install the thermostat (2).
  2. Install radiator outlet pipe.
  3. Install the radiator outlet pipe (1) to oil pan (2). Tighten the outlet pipe to oil pan bolt to 26 N.m (19 ft lbs).
  4. Connect the radiator hose (1) to the outlet pipe (3).
  5. Install trans-to-engine brace.
  6. Install right engine splash shield.
  7. Install right front wheel/tire assembly.
  8. Lower the vehicle.
  9. Install the outlet pipe bolts (1) through the exhaust manifold runners. Tighten bolts to 14 N.m (10 ft lbs).
  10. Install the exhaust manifold heat shield and bolts. Tighten the exhaust manifold heat shield bolts to 14 N.m (10 ft lbs).
  11. Fill the cooling system. Refer to DRAINING & FILLING COOLING SYSTEM - 2.2L (L61)Β .
  12. Start the engine. After the engine reaches normal operating temperature, check for coolant leaks.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.