Installation Procedure

2001 Chevrolet Suburban C1500SECTION Installation Procedure
    Fig 1: Sun Load Sensor
    GM612366Courtesy of GENERAL MOTORS COMPANY
  1. Connect the electrical connector.
  2. Install the sun load sensor (2) to the upper trim pad, turning it 1/4 turn to secure it in place.
  3. Install the instrument panel upper trim pad. Refer to Instrument Panel Upper Trim Pad Replacement in Instrument Panel, Gauges and Console.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.