Installation Procedure

2001 Chevrolet Suburban C1500SECTION Installation Procedure
    Fig 1: View Of Hood, Hinge & Bolts
    GM385497Courtesy of GENERAL MOTORS COMPANY
  1. Position the hood link assembly (6) to the vehicle.
  2. Refer to FASTENER NOTICE in Cautions and Notices.

    Install the bolt (5) holding the hood link assembly to the fender.

    Tighten 

    Tighten the link assembly to the fender bolt to 25 N.m (18 lb ft).

  3. Install the fender bolt (7) holding the hood link assembly to the hood hinge.

    Tighten 

    Tighten the hinge bolts to 25 N.m (18 lb ft).

RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.