Installation Procedure

2001 Chevrolet S10 Pickup 2D Pickup, 2.2 5, AutomaticSECTION Installation Procedure
WARNING: This page is about a different car, the 2004 Chevrolet Corvette. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: Upper Trim Pad & Air Distribution Duct
    GM95730Courtesy of GENERAL MOTORS CORP.
  1. Install the distribution duct into position on the upper trim pad.

    Insert the duct retaining tabs into the trim pad slots.

  2. NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the air distribution duct retaining screws to the underside of the trim pad.

    Tighten:Β  Tighten the screws to 1.8 N.m (16 lb in).

  4. Install the I/P upper trim pad. Refer to Trim Pad Replacement - Instrument Panel (I/P) Upper in Instrument Panel, Gages and Console.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.