Pressure Regulator: Installation

2001 Chevrolet Chevy Express G2500, Van Passenger Extended, 5.0 MSECTION Installation
WARNING: This page is about a different car, the 2003 GMC Sonoma, 2003 GMC Jimmy, 2003 Chevrolet S10 Pickup, and 2003 Chevrolet Blazer. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the pressure regulator valve (1).
  2. Install the pressure regulator isolator spring (3) and the pressure regulator valve spring (2). See Figure.
  3. Install the reverse boost valve (4) in the reverse boost valve sleeve (5).
  4. Install the reverse boost valve (4) and sleeve (5) in the oil pump cover. See Figure.
  5. Compress the reverse boost valve sleeve into the bore of the oil pump to expose the retaining ring slot.
  6. Install the reverse boost valve retaining ring, then slowly release tension on the reverse boost valve sleeve. See Figure.
  7. Install the transmission oil filter and pan. See DRAINING & REFILLINGΒ  under LUBRICATION.
  8. Lower the vehicle. Fill transmission with appropriate fluid to proper level. See LUBRICATIONΒ .
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.