Test Description

2000 Chevrolet Cab & Chassis K2500, 7.4 J, AutomaticSECTION Test Description
WARNING: This page does not describe the selected car, but rather 11 other vehicles, including the 2002 GMC Yukon XL, 2002 GMC Yukon, 2002 GMC Sierra, 2002 GMC Cab & Chassis Sierra, and 2002 Chevrolet Tahoe. However, it is still accessible from the selected car via links, so may be relevant.

The numbers below refer to the step numbers in the diagnostic procedures.

  1. 4

    This step tests for voltage at the fuel injector harness connector. The INJ fuse supplies power to the coil side of the fuel injector harness connector. If the fuse is open, a short to ground on the ignition 1 voltage supply circuit of the fuel injector is indicated.
  2. 5

    This step verifies that the PCM is able to control the fuel injector. If the test lamp flashes, the PCM and the wiring are okay.
  3. 6

    This step tests if a ground is constantly being applied to the fuel injector.

RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.