Installation Procedure

1998 Chevrolet Suburban K2500, 7.4 J, Part TimeSECTION Installation Procedure
WARNING: This page is about a different car, the 2003 Pontiac Grand Prix. However, it is still accessible from the selected car via links, so may be relevant.
  1. Connect the electrical connectors to the DRL module.
  2. Position the DRL module to the BCM bracket, then slide the module downward to secure the module tabs into the retaining slots on the bracket.
  3. Install the left IP insulator. Refer to CLOSEOUT/INSULATOR PANEL REPLACEMENT - LEFT in Instrument Panel, Gages and Console.
    Fig 1: Connecting Electrical Connectors To Daytime Running Lights Control Module
    G01503213Courtesy of GENERAL MOTORS CORP.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.