1996 Chevrolet Chevy Van G30, Van Cargo Extended, 6.5 YFACTORY OEM SERVICE PROCEDURE

Opening Pressure Test

  1. Open tester shutoff valve 1/4 turn from closed position. Slowly depress tester lever and observe gauge. Note pressure at which needle of pressure gauge stops. Some injector nozzles may pop while other injector nozzles may drip (this is not a leak).
  2. Injector opening pressure should not fall to less than 1500 psi (105 kg/cm2 ). Replace any injector nozzle that does not meet lowest acceptable pressure. Release tester pressure.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.