Valve Body: Installation

1995 Chevrolet Sportvan G20, 5.7 KSECTION Installation
  1. Coat check balls with petroleum jelly. Install check balls in proper locations on separator plate. See Figure and Figure . Install manual valve link. Ensure manual valve link is properly seated in manual valve. See Figure. Improper positioning may prevent vehicle operation in "D" range.
    NOTE: Improper positioning of throttle valve link will result in erratic shift points or high oil pressure.
  2. Install valve body and retaining bolts. Tighten all bolts to specification. See TORQUE SPECIFICATIONSΒ . Lubricate oil filter "O" ring with ATF before installation. To complete installation, reverse removal procedure. Fill transmission with fluid.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.