Circuit/System Verification

2013 Buick Regal Turbo Premium, Standard TransSECTION Circuit/System Verification
WARNING: This page is about a different variant/trim than selected.
  1. Ignition OFF, measure and record the battery voltage at the C1 12V battery terminals. The battery voltage should stabilize between 12.4 and 12.8 V within a few minutes of turning the ignition OFF.
  2. Ignition ON, observe the scan tool Ignition 1 Signal parameter in the 14V Power Module data list. The parameter should be within 4.5 volts of the Low Voltage Circuit Voltage measured at the C1 12V battery.
    • If the voltage is not within the specified range, check the ignition circuit to the K59 starter generator control module for high resistance.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.