Installation Procedure

2010 Buick Lucerne CXL, 3.9 MSECTION Installation Procedure
WARNING: This page is about a different car, the 2011 Cadillac DTS. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: View of Shift Indicator Lamp
    GM689737Courtesy of GENERAL MOTORS COMPANY
  1. Install the shift indicator lamp (1) to the lamp socket.
  2. Install the lamp and socket to the shifter assembly.
  3. Rotate the shift indicator lamp socket clockwise.
  4. Install the console center trim plate. Refer to Front Floor Console Trim Plate Replacement .
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.