Installation Procedure

2000 Buick Regal GSSECTION Installation Procedure
  1. Install the thermostat.
    Fig 1: Thermostat (3.8L)
    G01764800Courtesy of GENERAL MOTORS CORP.
  2. Install the gasket and the water outlet housing.
  3. Install the water outlet housing bolts.

    Tighten:Β 

    Tighten the bolts to 27 N.m (20 ft lbs)Β 

  4. Install the radiator hose to the water outlet housing. Use the J 38185 to reposition and install the hose clamp to the water outlet housing.
  5. Install the air cleaner intake duct.
  6. Fill the cooling system. Refer to Draining and Filling Cooling System
  7. Install the fuel injector sight shield.
  8. Inspect for leaks.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.