11 00 050 Removing and installing/replacing engine (N63)

2011 BMW X5 50iSECTION 11 00 050 Removing and installing/replacing engine (N63)

Special tools required: 

IMPORTANT: Before lifting the engine, check the lifting lugs for damage (cracks) and to ensure they are seated securely.

Necessary preliminary work: 

Release engine wiring harness from electronics box and secure on engine against falling off.

Unlock all plugs (1) of DME control unit and disconnect.

Unlock plug on electronics box fan and disconnect.

Unlock and detach terminal strip (2).

Unlock all plugs on plug strip (3) and detach.

Fig 1: Identifying DME Control Unit Plugs
G06178359Courtesy of BMW OF NORTH AMERICA, INC.

Unlock plug strip (3) and remove towards top.

Release screws and remove retaining bar (1).

Unlock upper section (2) of partition seal in direction of arrow and remove.

Release grommets (3) for wiring harnesses from lower section of partition seal and from electronics box.

Installation: 

Make sure grommets are correctly seated so as to prevent ingress of moisture.

Fig 2: Removing Upper Section Of Partition Seal
G04793894Courtesy of BMW OF NORTH AMERICA, INC.

Open cover.

Release screw (1).

Tightening torque: 13 71 8AZ .

Remove battery positive lead (2) from battery positive connection point.

Fig 3: Identifying Battery Positive Lead And Screw
G06178361Courtesy of BMW OF NORTH AMERICA, INC.

Unlock and detach vacuum line (1) from vacuum pump.

Fig 4: Identifying Vacuum Line
G06178362Courtesy of BMW OF NORTH AMERICA, INC.

Release screws (1).

Remove DOUBLE PIPE (2).

Installation: 

Replace sealing rings and moisten with refrigerant oil.

Tightening torque: 64 53 5AZ .

Fig 5: Identifying Double Pipe And Screws
G04792677Courtesy of BMW OF NORTH AMERICA, INC.

Unlock water pipe (1) on heater end panel and detach.

Fig 6: Identifying Water Pipe
G06178364Courtesy of BMW OF NORTH AMERICA, INC.

Unlock and disconnect fuel feed line (1), seal off with special tool 13 5 160.

Seal off fuel delivery line (2) with special tool 13 5 162 .

Fig 7: Identifying Fuel Delivery Line
G06178365Courtesy of BMW OF NORTH AMERICA, INC.

Release screws (1) on engine mount on left and right. Tightening torque: 22 11 2AZ .

Fig 8: Identifying Self-Locking Nut
G04739616Courtesy of BMW OF NORTH AMERICA, INC.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.