3.0 Adhesive Application

2009 BMW Z4 35i, StandardSECTION 3.0 Adhesive Application
  • Processing temperature of glue cartridge 18Β°C - 30Β°C.
  • Object temperature, vehicle and new parts, min. 15Β°C.
  • After applying the adhesive, check whether an adhesive component has emerged at the back of the glue cartridge. If yes, break off the bonding procedure. Clean new part. Use new glue cartridge. Contact national hotline.
  • Join components and secure in position.
  • Remove excess adhesive. Do not use solvent cleaning agents.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.