11 61 365 Replacing front charge-air duct (N54)

2009 BMW 135i 2D Convertible, StandardSECTION 11 61 365 Replacing front charge-air duct (N54)

Special tools required: 

  • 11 8 670

See ENGINE- SPECIAL TOOLS .

Necessary preliminary tasks: 

IMPORTANT: Coat sealing rings of quick-connect couplings with antiseize agent.
Pressure pipes with quick-connect couplings cannot be fitted without antiseize agent.

Unlock quick-connect coupling.

Detach charge-air duct (1) from intercooler (2).

Installation: 

  • Coat sealing rings of quick-connect couplings with antiseize agent.
  • Pressure pipes must audibly snap into place.
Fig 1: Detaching Charge-Air Duct From Intercooler
G06175103Courtesy of BMW OF NORTH AMERICA, INC.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.