Preliminary Inspection

1998 Acura 3.5RL Special EditionSECTION Preliminary Inspection
WARNING: This page is about a different car, the 1998 Acura 3.2TL. However, it is still accessible from the selected car via links, so may be relevant.

Check generator wiring harness connections and drive belt tension. Ensure battery is fully charged. On 3.2TL, ensure fuse No. 20 (20-amp), located in underdash fuse/relay box is okay. On 3.5RL, ensure fuses No. 15 (7.5-amp) and No. 4 (20-amp), located in underdash fuse/relay box are okay. Turn ignition switch to ON position. Charging system light should come on. If charging system light does not come on, check for blown charging system light bulb and replace as necessary.

RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.