1993 Acura Integra GS-RFACTORY OEM SERVICE PROCEDURE

No MIL

  1. Turn ignition on. If oil pressure light is on, go to next step. If light is off, inspect fuse No. 23. If fuse No. 23 is okay, repair open circuit in Yellow wire between fuse and instrument cluster.
  2. If oil pressure light is on, turn ignition off. Connect ECM test harness connector between ECM and ECM connectors. Jumper ECM terminal A13 to body ground. See Fig 1 . Turn ignition on. If MIL is now on, go to next step. If light is off, replace MIL bulb or repair open in Green/Orange wire between ECM terminal A13 and instrument cluster.
  3. Measure voltage individually between ground and ECM terminals A23 and A24. If more than one volt is present on either terminal, repair open in that wire between ECM and ground terminal G101, located at thermostat housing. See Fig 2 . If less than one volt is present on each terminal, replace ECM and retest.
    Fig 1: Connecting ECM Test Harness
    G92A26203Courtesy of AMERICAN HONDA MOTOR CO., INC.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.