2012 Volkswagen CC (357) L4-2.0L Turbo (CCTA)FACTORY OEM SERVICE PROCEDURE

Climatronic Control Module J255 Pin Assignment, CC from MY 10 from 07 November 2011







Climatronic Control Module J255 Pin Assignment, CC from MY 10 from 07 November 2011

Special tools, testers and auxiliary items required

• Test Adapter (V.A.G1598/47)

• Due to differences in equipment levels, use the most current wiring diagram to find the exact assignment of the individual connector positions and assignments.


Factory service manual diagram




A - Connector 20-pin

• Due to differences in equipment levels, use the most current wiring diagram to locate the connector and pin assignments.

B - Connector 16-pin

• Due to differences in equipment levels, use the most current wiring diagram to locate the connector and pin assignments.

C - Connector 16-pin

• Due to differences in equipment levels, use the most current wiring diagram to locate the connector and pin assignments.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.