1987 Volkswagen Vanagon Base, AWDFACTORY OEM SERVICE PROCEDURE

Spray Pattern

  1. Remove a pair of injectors leaving electrical plugs and fuel lines connected. Disconnect electrical plugs from remaining installed fuel injectors.
  2. Hold injectors over pan. Operate starter briefly. Spray pattern must be an even, cone-shaped spray. Repeat test for remaining injectors.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.